Diablo Canyon nuclear plant cleared to operate past 2025

Argentina Noticias Noticias

Diablo Canyon nuclear plant cleared to operate past 2025
Argentina Últimas Noticias,Argentina Titulares
  • 📰 dcexaminer
  • ⏱ Reading Time:
  • 35 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 17%
  • Publisher: 94%

The decision allows PG&E to keep the plant online so long as the utility completes a lengthy relicensing process before Dec. 31, 2023, which requires it to outline a plan to address issues related to the safety and integrity of its reactors.

The decision allows PG&E to keep the plant online so long as the utility completes a lengthy relicensing process before Dec. 31, 2023, which requires it to outline a plan to address issues related to the safety and integrity of its reactors.

Diablo Canyon, located on the coast in San Luis Obispo County, is a major source of power in the state, supplying roughly 17% of California’s greenhouse-gas-free electricity supply and 8.6% of the state's total electricity. The NRC said in a news release that the exemption would “not present undue risk to the public health and safety, and is consistent with the common defense and security.”

High heat and wildfire conditions have stressed the state's power grid to near collapse in recent years, including in 2022, when the state endured its longest and most intense heat wave on record. Historic drought has also reduced its ability to generate hydropower by 48%.

Hemos resumido esta noticia para que puedas leerla rápidamente. Si estás interesado en la noticia, puedes leer el texto completo aquí. Leer más:

dcexaminer /  🏆 6. in US

Argentina Últimas Noticias, Argentina Titulares

Similar News:También puedes leer noticias similares a ésta que hemos recopilado de otras fuentes de noticias.

PG&E will be allowed to keep Diablo Canyon running past 2025PG&E will be allowed to keep Diablo Canyon running past 2025Anti-nuclear activists and national environmental groups earlier urged the federal agency to reject the exemption, saying in a petition that it amounted to a dangerous shortcut that would expose th…
Leer más »

PG&E can keep operating Diablo Canyon — at least for now, feds sayPG&E can keep operating Diablo Canyon — at least for now, feds sayPG&E cleared a major hurdle today in its bid to operate the Diablo Canyon nuclear plant beyond 2025. Sammy_Roth reports:
Leer más »

PG&E gets OK to keep Diablo Canyon onlinePG&E gets OK to keep Diablo Canyon onlineIn September, Gov. Gavin Newsom signed legislation to keep Diablo Canyon online for five more years, lending PG&E $1.4 billion to reverse its plans to decommission the facility and shore up its reliability.
Leer más »

Feds allow Diablo Canyon to stay open while seeking 20-year extensionFeds allow Diablo Canyon to stay open while seeking 20-year extensionBREAKING: PG&E will seek a 20-year permit — but state officials only want the nuclear power plant open through 2030 to smooth the transition to renewable energy.
Leer más »

AI is set to boom into a $90 billion industry by 2025 amid ChatGPT frenzyAI is set to boom into a $90 billion industry by 2025 as ChatGPT generates investment frenzy, UBS Wealth Management CIO says
Leer más »

Rivals.com - Five new four-star WRs unveiled for 2025 class
Leer más »



Render Time: 2025-04-06 11:46:14